Job sequence

       TASK 1 : Selection of speed

       •  Observe the speed chart in the machine.           •  Switch on the machine, the speed is 1600 rpm.
       •  Change the right side lever in E.                 •  Again and again change different lever at the chart
                                                               method and take different speed.
       •  After change the bottom side lever in B
       •  Then change the another bottom lever D


                                                      Table 1

                       M/Min                                      E                           F

                 A                      S                                                    38

                 B                      S

                 C                      S                       580

                 D                      S

                 A                      R                                                    71

                 B                      R

                 C                      R
                 D                      R                       1600


      •  Identify speed change lever position A, B, C, D & E, F,
         S, R.                                                 Note : According to the machines available in
                                                               your institute prepare the speed chart for
      •  Record in table 1.                                    practice for the trainees.

      •  Get it verified by your instructor.


       TASK 2 : Selection of feed

       •  Observe feed chart in the machine.                •  After number change shaft rotate the number 6
       •  Change the top left side lever G                  •  Switch ON the machine and engage carriage feed lever
                                                               and get feed rate 0.07mm/rev.
       •  Change the bottom left side lever K
       •  Change the bottom right side lever Z