Page 71 - Turner 1st sem Practicals
P. 71

Job Sequence

            TASK 1 : Extractor method
                                                                  •  By using tap wrench/wrench turn in anticlockwise
            •  Note the condition/position of the broken tap.
                                                                    direction.
            •  Study and try to insert the tap extractor leaves if
               possible. (dont try to bend the leaves.)             Using excessive torque on wrench will cause
                                                                    leaves to twist while extracting the tap.
            •  After inserting to a possible depth in the flute gap, push
               down the collar downwards for gripping.            •  If required lubricate and twist to extract the tap.

            •  Light blow over the extractor will release the tap from
               threaded body.



            TASK 2 : Punch and hammer method

            •  Use centre punch over the flute gap.               •  Like wise use all the flute gap to punch and rotate tap
                                                                    in anticlockwise direction till it comes out to sufficient
            •  Light stroke on punch to turn the tap anticlockwise  length to grip by plier/extractor.
               direction.
                                                                    While punching do not chip out the punch
                                                                    which will clog inside and the broken tap will
                                                                    jammed.




            TASK 3 : Easy out method

            •  Heat the broken tap to red hot condition by blow lamp.  •  Check with a punch whether the tap has become soft.
            •  Light stroke on punch to turn the tap anticlockwise in  •  drill out tap portion to max drill dia. (for e.g. on M6 tap
               the red hot condition, if it is not possible to remove the  use 3.5 or 4 dia. drill).
               broken tap, then cool down by annealing it.
                                                                  •  The rest of the portion to be removed either by drift or by
                                                                    extractor.









































                                      Producltion & Manufacturing : Turner - Exercise 1.2.21                    59
   66   67   68   69   70   71   72   73   74   75   76