Job sequence

       TASK 1 : Layout marking

       Marking
       •  Check the raw material for its size and its squareness.
       •  Apply prussian blue on one side of the job end and allow
         it to dry.
       •  Scribe parallel lines to the edges 'x' and 'y' using a
         surface gauge.
       •  Draw the horizontal and vertical lines as per drawing.
         (Fig 1)
























          To avoid confusion, do not scribe the line
          longer than necessary.

       •  Scribe two lines by joining points 'ab' and 'cd' using a
          steel rule and scriber. (Fig 2)
       •  Punch witness marks and complete 'Z'.
       •  Place the dot-punch in position; while doing so, rest
          your hand on the workpiece. (Fig 3)
       •  Set the dot-punch upright.
       •  The dot-punch is struck with the hammer; the blow
          must be delivered in the direction of the dot-punch axis.
          (Fig 4)













       TASK 2 : Hacksawing differnet material

       •  Check the material to size.                       •  Secure the job in the vice.
       •  File and remove the burrs from the edges.         •  Select the blade of correct pitch and fix the blade to the
                                                               hacksaw frame.
       •  Apply marking media only where marking is required.
                                                            •  Select coarse pitch blade for solid metal and fine pitch
       •  Mark the cutting line by a scribing block and a steel rule.
                                                               blade for conduit tubes pipes and thin metal sections.