Job sequence

       TASK 1 : Marking I

       •  Check the raw material for its size.              •  Rotate the round rod and set to vertical position of
                                                               scribing line with help of try square and mark centre
       •  Apply marking media on one side of the job and allow  point.
         it to dry.
                                                            •  Scribe the horizontal line away 12mm from centre point.
       •  Place the round rod on 'V' block.
                                                            •  In the same way to mark other three sides.
       •  Scribe the centre line of the round rod.
                                                            •  Punch witness mark of four sides of marking line.



       TASK 2 : Marking II

       •  Apply the marking medium.
       •  Scribe the centre lines and parallel lines to the edges
         'x' and 'y'. (Fig 1)










                                                            •  Punch centre marks on all the four circles.

                                                            •  Draw all the four circles using a divider.
                                                            •  Draw R8 and R10 curves a little more than the length
                                                               required.
                                                            •  Draw two tangents close to the edges of the 'x' and
       •  Set 97° on the bevel protractor.                     circles using a steel rule and scriber. (Fig 2)
       •  Mark 97° line through point '0' and get the centres of the  •  Punch witness marks.
         other two circles. (Fig 2)